Erection Considerations It is seen that if proper erection sequence and methodology is not followed, it may result in time and cost overrun, duplication of jobs, dismantling & re-erection, accidents, loss of life and property. Therefore, this is also one of the main basic consideration which every engineer/entrepreneur must be aware of. The following erection considerations shall be taken into account 1. Erection Sequence 2. Erection Methodology 3. Special Requirements/OD consignment, Before building roof erection, 4. Minimizing Erection Time. In situ erection (THF Example) 5. Temp Protection Requirements 6. Erection of Cranes-Tower Cranes, Jib Cranes, Hydra, 7. Batching Plants-Capacity & Number 8...
Posts
Showing posts with the label Erection